
Kurita of America contracted MIINC, L.P. to model and construct the process piping and pipe support system for Shintech’s Phase II Wastewater Treatment Facility. This multi-system process piping project included erection of catwalks and structural bridge supports to integrate the process piping, process controls and electrical needs of this critical facility.

When constructed in 2009 this facility was the largest producing bulk cement plant in the United States. MIINC, L.P. completed the 3D model and constructed the process piping side of this project.
Halliburton – Basra, Iraq, Bulk Cement Plant

This project was modeled and prefabricated in MIINC, L.P.’s Dallas Texas facility. It was then containerized and shipped from the Houston ship channel to the port at Basra Iraq. The prefabrication and planning resulted in a record setting site installation of a Bulk Cement Plant for Halliburton.
Schlumberger – Shreveport, Louisiana, Bulk Cement Plant

MIINC, L.P. was called on to construct the process side of this plant for a configuration first in the 2009 Schlumberger Bulk Cement project in Shreveport. Working from the concepts forwarded by Schlumberger the project helped to establish a design for multiple facilities.
Halliburton – Bossier City, Louisiana Bulk Cement Plant
Halliburton – Victoria, Texas Bulk Cement Plant
Mack Energy – Artesia, New Mexico Acid Facility
