Project Description

Medical City Plano Chiller Replacement
This was the first of several projects with Henderson Building Solutions. It was a $600,000 retrofit that included demolishing an existing 700 ton chiller that could no longer keep up, with a new 1000 ton water-cooled magnetic chiller. Along with the chiller, 2 pumps were replaced to feed higher volumes of chilled and condensed water to the chiller. MIINC was the prime contractor on the job with 10 subcontractors. The challenge with this project was rolling in 17ft barrels around the corners of corridors in the Hospital without interrupting operations.
Completed: 2018
Owner: HCA Healthcare
Project Value: $600,000
Duration: 3 months
Medical City Plano OR AHU Replacement
Henderson Building Solutions came to us with a $1.9 million retrofit that included demolishing one rooftop AHU and another in a cramped penthouse. We would in return install two rooftop AHUs along with a new air-cooled glycol chiller, 2 pumps and several glycol accessories in the penthouse. MIINC was the prime contractor on the job with 13 subcontractors. This particular project had several challenges that MIINC had to coordinate weeks in advance with all parties involved. Several weekend crane picks were utilized and shutdowns were necessary in order to have the operating rooms functional and compliant by Sunday evenings.
Completed: 2019
Owner: HCA Healthcare
Project Value: $1,900,000
Duration: 5.5 months
Medical City Plano AHU-4
MIINC teamed up a 3rd time at Medical City Plano with Henderson Building Solutions for a one weekend replacement of a rooftop AHU. MIINC was the prime contractor on the job with 7 subcontractors. The shutdown began on a Friday, with weather delays causing a crane pick to be moved to Saturday morning. The gym below was operational by Sunday evening.
Completed: 2019
Owner: HCA Healthcare
Project Value: $160,000
Duration: 3 days
Need An Expert Mechanical Partner For Your Project Or Business?
Pizza Restaurant #5
Project Engineer: Ryan Sammons Phone: 214-575-9600 Mobile: 972-506-9111 Web: miinc.lpcom Email: RSammons@miinclp.net 2025 McKenzie
Voxx Exhibits
Project Engineer: Ryan Sammons Phone: 214-575-9600 Mobile: 972-506-9111 Web: miinc.lpcom Email: RSammons@miinclp.net 2025 McKenzie

Bulk Cement Plant – Various Projects
Bulk Cement Plant - Various Projects

Methodist Mansfield Medical Center ED/ICU Addition – Mansfield, TX
Methodist Mansfield Medical Center ED/ICU Addition

Methodist Charlton Medical Center – Bed Tower Addition
Methodist Charlton Medical Center Bed Tower

Northlake College, Building G – Irving, TX
Northlake College, Building G – Irving,

Dallas County Community College District Office – Dallas, TX
DCCC District Office – Dallas, TX
Paris Junior College – Greenville, TX
Paris Jr. College – Greenville, TX