Project Description

Methodist Charlton Medical Center Bed Tower Addition
Charlton Methodist is part of the Dallas-based Methodist Health Systems. MIINC was the Mechanical Sub-Contractor on this 8-Story 72-bed Bed tower addition that included one floor of common area and central sterile area, one floor of OR’s and pre / post-op areas, (2) Floors of patient rooms, and (4) floors of shell space. Chilled water domestic water, oxygen, CO2, and Nitrogen were supplied from the exiting central plant. A new heating water system was installed including (2) 11,000 MBH boilers and fuel oil supply systems. Five new air handling units were added (approximately 700 tons total) including one fan wall surgical unit. New medical air, medical vacuum, instrument air and reverse osmosis systems were added
Need An Expert Mechanical Partner For Your Project Or Business?
Pizza Restaurant #5
Project Engineer: Ryan Sammons Phone: 214-575-9600 Mobile: 972-506-9111 Web: miinc.lpcom Email: RSammons@miinclp.net 2025 McKenzie
Voxx Exhibits
Project Engineer: Ryan Sammons Phone: 214-575-9600 Mobile: 972-506-9111 Web: miinc.lpcom Email: RSammons@miinclp.net 2025 McKenzie

Bulk Cement Plant – Various Projects
Bulk Cement Plant - Various Projects

Methodist Mansfield Medical Center ED/ICU Addition – Mansfield, TX
Methodist Mansfield Medical Center ED/ICU Addition

Methodist Charlton Medical Center – Bed Tower Addition
Methodist Charlton Medical Center Bed Tower

Northlake College, Building G – Irving, TX
Northlake College, Building G – Irving,

Dallas County Community College District Office – Dallas, TX
DCCC District Office – Dallas, TX
Paris Junior College – Greenville, TX
Paris Jr. College – Greenville, TX